A clause 4.6 variation is a request to approve a development that breaks a development standard in the Local Environmental Plan, such as the height limit or the floor space ratio. The applicant has to show that compliance is unreasonable or unnecessary in the circumstances, and that there are sufficient environmental planning grounds to justify the breach.
The name is simply the clause number. Every Local Environmental Plan written to the state’s Standard Instrument carries the same exception at clause 4.6, the Sutherland Shire's local plan among them.
What counts as a development standard
A development standard is a rule in the plan, usually a number, that controls the size and form of a building. Height, floor space ratio and minimum lot size are the common examples. NSW Planning calls the most important of them principal development standards, which is why they sit in the plan itself.
Some standards cannot be varied at all. A plan can exclude a standard from clause 4.6, and the NSW Government now allows new exclusions only in limited circumstances. Read the clause in your council’s plan before you build a design around a variation.
The two tests
Under the current clause, in effect since 01/11/2023, the consent authority has to be satisfied that the applicant has demonstrated both of these:
- Compliance is unreasonable or unnecessary in the circumstances of the case.
- There are sufficient environmental planning grounds to justify breaking the standard.
One way to meet the first test is through the purpose of the standard. Say a height limit exists to protect sunlight to the homes next door, and the extra height casts no extra shadow on anyone. The applicant can argue that the purpose is met without strict compliance. The NSW Government points to the Land and Environment Court case Wehbe v Pittwater Council, from 2007, as the source of that approach.
The second test asks for environmental planning grounds that justify the breach for this particular proposal, set out in the request itself.
What changed in 2023
Before the reforms, the consent authority also had to be satisfied that the development was in the public interest because it was consistent with the objectives of the standard and the zone. That test was removed from clause 4.6, because the same matters are already weighed when any development application is assessed.
The Planning Secretary’s agreement, known as concurrence, is no longer needed either. Councils now enter the reasons for approving or refusing each variation in the NSW Planning Portal, so the decisions sit on a state record.
The written request
The applicant lodges a written document with the development application that addresses both tests. The Environmental Planning and Assessment Regulation 2021 requires it, and the department has published a guide to varying development standards, with a template for the request.
NSW Planning’s advice to homeowners is blunt. Councils do not vary standards lightly, and the change has to be clearly justified. A request that only says the breach is small does not address either test, so it gives the assessor nothing to approve.
Variation or planning proposal
A variation suits a design that goes over a standard by a margin the site can justify. A change to the zone, or to the controls for a whole site, goes through a planning proposal, which amends the plan itself. It asks a different question: whether the rules for the land should change, rather than whether one building can depart from them.
Either way, the maps come first. Our note on floor space ratio in NSW explains how that standard is worked out and why the full figure is not always reachable on a given lot.
Before you draft a request
The design decides whether a variation has a case. A building that goes over the height limit at one corner, because the land falls away, tells a different story from one that adds a whole extra floor. The first is about the site, and the second is about wanting more floor area.
We prepare development applications and planning proposals from our office in Caringbah. If a design for your site sits over a standard, talk to us before the request is written.