In NSW, the detailed design and planning rules for a type of development or a particular area sit in the council’s development control plan, or DCP. The DCP works under the Local Environmental Plan, which zones the land and sets the main development standards, and it fills in the detail that plan leaves out.

The two are read together, and they carry different weight. NSW Planning calls the Local Environmental Plan the principal legal document for controlling development at council level, while the DCP provides guidance.

What a DCP covers

NSW Planning’s guide for homeowners says a DCP sets out its rules in simple language, with diagrams and pictures, on matters such as building design, siting and size, access to sunlight and view sharing. It also covers gardens and planting, car parking, heritage, stormwater treatment, waste management, and the fences and walls around a lot.

A DCP can cover a type of development across the whole council area, such as apartment buildings or houses. It can also cover a single place, with rules written for that one street pattern or centre.

How it differs from the Local Environmental Plan

The Local Environmental Plan does four main things. It zones land, it sets the principal development standards that control the size and form of development, and it flags both heritage and environmental issues, such as flooding or bushfire, that affect a site. A design that breaks one of those standards needs a formal written request under clause 4.6, which has its own tests.

A DCP has more give in it. NSW Planning says the DCP provides guidance only, which means there can be flexibility to make variations when they are supported by a good argument in the development application. That is the difference a landowner notices first. A DCP control can be argued on its merits, while a standard in the plan needs a formal request to vary.

None of this makes a DCP optional. The council still reads every application against it, and a design that departs from a DCP control has to make the case for it in the application.

What a DCP cannot do

A DCP works inside the Local Environmental Plan, never above it. Where a DCP control is inconsistent with the plan, the plan prevails, so a DCP cannot allow a use the zone prohibits or lift a height limit the plan sets. Its role is to shape a building that the plan already allows.

When state rules come first

State policies can sit above both. In the areas covered by the state’s low and mid-rise housing policy, its standards prevail over any more onerous standard on the same matter in the council’s plan or DCP. The Apartment Design Guide also provides consistent planning and design standards for apartments across the state, so an apartment design answers to the guide as well as to the council’s documents.

The DCP in the Sutherland Shire

Sutherland Shire Council has its own development control plan, which works alongside the Sutherland Shire Local Environmental Plan 2015. Councils amend their DCPs as their areas change, so read the current version on the council’s website before a design starts, rather than a copy saved from an earlier project.

For a site in Cronulla, Caringbah or anywhere else in the Shire, the order is the same. Find the zone and the standards first. Then read the parts of the DCP that apply to the type of building and the place, and note every control the design will have to meet or argue against.

Why it matters to a buyer

The DCP also explains a street. How far a building sits from its boundaries, how it is sited on the lot and where its car parking goes are the kind of matters a DCP controls. For someone buying a home, it shows what the rules would allow on the lot next door, and that shapes the light and the outlook from the home they are buying.

Where to start

Our note on how to find the zoning of your land in the Sutherland Shire covers the Spatial Viewer and the planning certificate, which give you the zone and the standards for a lot. The DCP comes next, and it is where much of the detail that shapes a design is written down.

Development applications are part of our planning work from Caringbah, and the council’s DCP sits behind every one we prepare. If you want to know how it applies to your site, talk to us.