Land in the NSW coastal zone is mapped into four coastal management areas, and a development proposal on mapped land is assessed against the state’s coastal rules as well as the council’s own plans. For land near the beaches and bays around Cronulla, check the maps on the NSW Planning Portal’s Spatial Viewer before a design starts.
The rules sit in Chapter 2 of the State Environmental Planning Policy (Resilience and Hazards) 2021. That chapter maps each area for the purposes of two Acts, the Coastal Management Act 2016 and the Environmental Planning and Assessment Act 1979, and it sets out how proposals in the coastal zone are assessed.
The four areas
The NSW Government sets out the four areas like this:
- Coastal wetlands and littoral rainforests area. Land that shows the characteristics of coastal wetlands or littoral rainforests.
- Coastal vulnerability area. Land subject to coastal hazards such as beach erosion and tidal inundation.
- Coastal environment area. Land with natural coastal features such as beaches, rock platforms, coastal lakes and lagoons, and undeveloped headlands, along with marine and estuarine waters.
- Coastal use area. Land next to coastal waters, estuaries, and coastal lakes and lagoons, where urban coastal development is found.
The Coastal Management Act 2016 gives each area its own management objectives, matched to its values and the threats it faces.
Why the check matters in Cronulla
Cronulla sits on a peninsula, with ocean beaches along one side and the waters of Port Hacking on the other. A great deal of the suburb is close to the water, and land close to the water is what the coastal maps were drawn to cover. On a site here, the coastal check belongs at the start, before anyone draws a line.
Our own development in the suburb, a’Maré, sits on Bando Road above Elouera Beach. Building that close to the ocean shaped the ground work and the finishes on the outside of the building, which we cover in our note on building near the water in the Sutherland Shire. The coastal maps are the planning side of the same question.
How to check a lot
- Open the NSW Planning Portal’s Spatial Viewer and search the address.
- Find the Resilience and Hazards SEPP maps, which the viewer shows alongside the other local and state planning controls for the land.
- Order a planning certificate from Sutherland Shire Council, which lists the planning controls and constraints that apply to the lot.
Our note on how to find the zoning of your land in the Sutherland Shire walks through the Spatial Viewer and the certificate in more detail. For questions about Chapter 2 itself, the department lists an email contact on its Resilience and Hazards SEPP page.
What a mapped area changes
A coastal management area does not rule out building on its own. The coastal use area, for one, covers land next to the water where urban coastal development is found. What changes is the assessment, which has to follow the policy’s rules for proposals in the coastal zone.
In practice, a development application on mapped land has to answer to the coastal chapter as well as to the zone, the height limit and the other controls in the council’s plan. A design that has the coast in mind from the first sketch makes that part of the application far easier to write.
Changes to the rules themselves are tested against the coast too. A planning proposal in the coastal zone has to be consistent with any coastal management program for the area, or an older coastal zone management plan that still has effect.
A first check, not the last
The coastal maps tell you which rules apply to a lot. They do not tell you what the lot can hold, which comes down to the zone, the height and floor space ratio limits, and the design itself.
A feasibility study puts those pieces side by side, and it tells a landowner whether a site near the water is worth taking further. Feasibility studies are part of our planning work across the Shire, and for a site near the water the coastal maps are one of the first things a study checks.