Building near the water in the Sutherland Shire starts in the ground, because coastal sites often sit on sand, and it carries through to every material that will face salt air. The view gets the attention. The real work is holding back loose ground while you dig, then choosing a structure and finishes that will last in salt and wind.

The ground at a’Maré

a’Maré, our three full floor residences at 2 Bando Road in Cronulla, sits on a sandy site above Elouera Beach with a one level basement. Sand will not hold a vertical face on its own, so you cannot simply dig a hole and start building. Here is the order the ground work ran in, with the dates from our own site posts.

  1. On 13/01/2025 a CFA piling rig was on site to install contiguous pile shoring around the basement perimeter.
  2. On 06/02/2025 screw piles went in for the crane base.
  3. On 24/02/2025 the capping beam along the top of the pile wall was done.
  4. By 05/04/2025 the basement dig was almost complete.
  5. On 14/05/2025 the basement slab was poured.

CFA stands for continuous flight auger. A long hollow screw drills down into the ground, and concrete is pumped through its centre as it lifts back out, so the hole never stands open in the loose sand. Contiguous means the piles sit side by side around the edge of the dig and work as a wall. The capping beam then ties their tops together, and only after that does the excavation go down.

Why the frame is concrete

The frame takes time, and a fair question is why it is not built with blocks. Our answer is that it has to be concrete. A concrete frame ties the slabs, walls and columns into one structure, and at a’Maré that is what carries the terraces, the pools and the spas. On this site the Level 4 concrete pour was complete by 11/11/2025, and internal fit-out and facade works came next.

The concrete itself needs care near the sea. Salt that works its way into a slab or a wall reaches the steel inside, and rusting steel swells and cracks the concrete from within. Cover over the steel and the quality of the pour both matter a great deal more here than they do further inland.

Salt air and the finishes

Salt also goes after everything on the outside of the building. Exposed metal needs the right grade and the right coating, and it needs a fresh-water rinse every so often once you live there. Stone needs a full system underneath it, from the membrane up to the sealer. We name the products we used at a’Maré in our note on natural stone in a beachside home.

The scaffold came down at a’Maré on 22/05/2026, and from that day the whole facade has faced the salt air. The finishes on a coastal building are tested from the day they go on, well before anyone moves in.

Wind, sun and glass

A site near the water usually has its best view on its most exposed side. On the Cronulla coast that means terraces that take a stiff breeze and windows that catch salt spray. Good design puts the outdoor rooms where people can actually sit, with screens or a wall against the worst of it, and uses the plan to bring light in from more than one side. Each a’Maré residence has a terrace that looks out to sea.

Council rules in the Shire

Cronulla, Caringbah and the rest of the Shire come under Sutherland Shire Council, and the NSW Government tells applicants to talk through local planning requirements with their council before they start. Development applications go in online through the NSW Planning Portal. Coastal blocks bring their own questions about height, setbacks and neighbours, so a feasibility study pays for itself early. It tells you what the site can hold before you spend money on detailed drawings.

If you own a block near the water and do not want to take this on alone, read our note on how a development joint venture works. Our office is in Caringbah, and a’Maré is the best explanation we can give of how we build on this coast.