Buying off the plan from a builder-developer means one company plans the building, builds it and sells it to you, so the promise and the work sit under one name. You still sign a contract for a home that does not exist yet. Check who is behind it, read the disclosure statement line by line and have your solicitor or conveyancer review everything before you exchange.
What builder-developer means
A developer finds the site, gets the approvals and sells the homes. A builder holds the licence and does the construction. In many projects those are separate companies with a contract between them. A builder-developer does both, which is how we work: we procure, plan, develop and deliver our own projects.
The practical upside is a short chain. When the person choosing the stone answers to the same company as the person laying it, a decision about quality does not have to cross a contract. You still need to check the work, and you should expect a builder-developer to show you finished homes so you can do that.
What to look at first
Past work comes first, because a render costs far less than a building. Ask to walk through a finished home by the same company, and look at the details that are hard to fake: the joints in the stone, the way the doors close, how the terrace drains. Our record is listed on the projects page, and a’Maré in Cronulla is the most recent job we developed and built ourselves.
Then ask who runs the site. We keep an experienced construction manager on site full time, and that is a fair thing to ask of anyone building your home. If the project is an apartment building, read our note on what a Class 2 building is, because NSW has extra rules for these buildings.
What NSW law gives you
These points come from the NSW Registrar General and apply to off the plan contracts for residential property.
Cooling off. You have 10 business days, which is double the 5 business days on an established home.
Disclosure statement. The vendor must attach one to the contract. It includes a draft plan from a registered surveyor and other drafts depending on the scheme, such as the schedule of finishes and the by-laws. If the required documents are missing when you sign, you can rescind within 14 days of exchange.
Changes. The vendor must tell you about changes that make what was disclosed inaccurate in a material way. In some cases you can then rescind or claim compensation, with short time limits, so read any notice the day it arrives.
Sunset clause. This lets either party end the contract if an event, such as the registration of the plan or the issue of an occupation certificate, has not happened by the set date. A vendor needs your written consent or a Supreme Court order to rescind under a sunset clause. Check the date in your contract, and ask your solicitor what it means for you.
Deposit. It sits in a trust or controlled money account for the contract period and cannot be released to the vendor before settlement. A bank guarantee or deposit bond can stand in for cash.
Registered plan. The developer must give it to you at least 21 days before settlement.
Questions to ask about the home
Read the schedule of finishes as if you are already living there. Every line should name a product. Where it says “or equivalent”, ask who decides what counts as equal.
- Which way does each room face, and what could be built next door?
- What are the stone, tapware and appliances, by name?
- Where exactly is the car space or garage, and is there storage?
- What do the draft by-laws say about pets, renovations and short-term letting?
- What will the levies be in the first year, and how were they worked out?
- When can I inspect before settlement, and how are defects recorded?
Questions to ask about the building
NSW has rules that sit behind the scenes on apartment buildings. An occupation certificate must be issued before the building can be occupied. It comes from the council or a private certifier and is the last step in the approval process. Ask when it is expected. In new apartment buildings of four storeys or higher, the developer must also pay a building bond of 2% of the contract price to Building Commission NSW.
During the first stage of the scheme, the developer acts as the owners corporation, with limits on what it can do. Ask for the initial maintenance schedule and the documents the developer must hand over before the first annual general meeting.
After you move in
NSW law sets statutory warranties on residential building work, and action to enforce them must begin within 6 years for major defects and 2 years for all other defects. Ask your solicitor how they apply to your purchase. Then ask the vendor directly who you call when something needs attention. Ongoing after-sale care is part of our development work, and any builder-developer should be able to tell you what that means in practice.
This note is general information and does not replace legal advice on your contract. If you want to look at how we work before you read any contract, talk to us.
