At a pre-settlement inspection of a new home, you check that everything in your contract and schedule of finishes is installed, finished and working. Anything missing, damaged or incomplete goes on a written list with photos, and that list goes to the developer before you settle.

What to bring

The NSW Government’s guide for new home owners, on the Planning Portal, says to take your contract and check the home against your inclusions list. It also says to take photos. If you bought off the plan, your contract came with a proposed schedule of finishes. NSW requires off the plan vendors to supply draft documents such as a plan, a schedule of finishes and draft by-laws. Bring these with you:

  • The contract, the schedule of finishes and any notices of change.
  • The registered plan, which the developer must give you at least 21 days before settlement.
  • A phone for photos, a notepad and a tape measure.
  • A torch, so you can look along stone and paint at a low angle.

Check what your contract says about inspecting before settlement, and book yours as early as it allows. The earlier you go, the more time the developer has to work through your list before you settle.

Room by room

Work through the home in the same order every time, starting at the front door. In each room, check these things:

  • Doors, drawers and cupboards open, close and line up.
  • Stone and tiles have no chips or cracks, and the joins are tight.
  • Every tap runs hot and cold, and every drain clears.
  • Paint covers evenly, with no marks or patches.
  • Windows and doors lock, and their seals sit tight.
  • Every light, switch and power point works.

Outside, run water onto the balcony or terrace and watch where it goes. It should drain away, not sit against the door. Then check that the car space and any storage cage match the numbers on the plan.

The named products

A schedule of finishes names products, and the home should match it line for line. In a fully fitted home that list is long. At a’Maré in Cronulla it includes an Escea gas fireplace, Sonos in-ceiling speakers and integrated Miele appliances. It also covers Daikin VRV air conditioning with home automation, an audio-visual intercom and a remote-controlled double garage.

Each one is a model you can check against the schedule, and each one should switch on and work while you stand there. Ask for the manuals and warranty cards for every appliance and system at the same time, so they are in your hands on the day you move in.

Vendors in NSW must tell buyers about changes that make what was first disclosed inaccurate. If you find a difference you were never told about, raise it with your solicitor or conveyancer before settlement.

What the certifier checks

An occupation certificate authorises the occupation and use of a new building, and it must be issued before anyone moves in. The principal certifier issues it once satisfied that the development meets the regulatory standards. The Planning Portal is plain about the limits of that job: the certifier checks that the building is suitable for occupation, which is different from guaranteeing the quality of its fittings and finishes.

So the certificate tells you the building can be lived in. It does not tell you the stone is free of chips, and that is why the inspection is yours to do. The same guide suggests hiring a professional building consultant to help you on the day.

After you settle

If you notice a defect after you move in, report it to the builder in writing as soon as you can, keep a copy and include photos. If you and the builder disagree, NSW Fair Trading gives free information and help. Statutory warranties run for 6 years for major defects and 2 years for other defects from completion. Our note on home building compensation for new apartments covers what happens if a builder can no longer do the work.

How we handle it

We develop and build our own residences, so the company you settle with is the same company that fixes the list. An experienced construction manager is based on our sites full time, and ongoing after-sale care is part of our development work. If you are buying before the home is finished, our note on buying off the plan from a builder-developer covers the contract side.