On a residential building site, the construction manager is the person who turns the drawings into a finished building, day by day. They set the order of the work, book the trades and the materials, check each stage before it is covered up, and keep the client and the design team up to date.

The program

Every building is a sequence. The ground has to be secured before the dig, the dig finished before the basement slab, and each floor poured before the next one goes on top. The construction manager keeps that order in a program, which lists every stage, the trade that does it and the work that has to be finished first.

On a tight coastal site the order matters even more. At a’Maré in Cronulla, a piling rig built the contiguous pile shoring around the one level basement in January 2025. Screw piles went in for the crane base in early February, and the capping beam along the top of the pile wall was poured later that month, with the basement dig after it. Our note on how an apartment building is built follows the rest of that sequence.

The trades

A residential building brings a long list of trades through the gate, from piling and concrete to tiling, joinery and landscaping. The construction manager decides who is on site and when. One trade should not stand idle waiting on another, and finished work should not be damaged by the crew that comes after it. Each trade needs its area clear, its materials on site and the work before it signed off.

Deliveries and the crane follow the same plan. A concrete pour needs the trucks, the pump, the crew and the inspection lined up for the same morning, and a missed booking can cost a day.

Quality, stage by stage

Some work is hidden within days of being done. Reinforcement disappears under concrete, waterproofing goes under tiles, and pipes and cables go inside walls and ceilings. Once that work is covered, a mistake is expensive to find and harder to fix. A good construction manager checks each stage against the drawings and the specification before it is closed up.

Materials need the same care. At a’Maré, the membrane, glue, grout and sealer under the stone on the external columns were chosen as one system, so each product suits the others. The construction manager makes sure the system on the drawings is the system that goes on the building.

The link between the site and everyone else

The construction manager answers to the client and speaks for the site. When a detail on the drawings does not work on the ground, they take the question to the architect or the engineer and get an answer before the trade reaches it. When a decision is needed on a finish or a change, they put it to the client in time for it to be made properly. Neighbours hear from them too, about deliveries, noise and the crane.

On site full time

We manage our sites with a hands on approach, and our experienced construction manager is based on site full time. A manager who is there every day sees a problem while it is small, before it reaches the next trade or the next floor.

Our director, Matthew Martino, has 20 years in construction. His record includes site management (FDC) on the William Inglis Hotel in 2017 and on 175 self contained apartments at Macquarie University in 2021. FDC was the builder on both projects, and Matthew led the site. That experience of large buildings now feeds into the smaller residences we develop and build ourselves.

Questions to ask

If you are buying a home that is still being built, the construction manager is the person whose work you are relying on. These questions are fair to put to any builder:

  • Who manages the site day to day, and are they there full time?
  • How is hidden work checked before it is covered?
  • Who answers your questions during the build, and how quickly?
  • What records are kept of each stage, such as photos and inspection notes?

The answers tell you how the building is being looked after while nobody is watching. If you want to see how we work, talk to us.