A property developer takes a piece of land from an idea to finished homes, and carries the risk of the project from the first offer on the site to the last sale. The developer chooses the site, decides what to build, pays for the design and the approvals, arranges the finance, engages a builder or builds in-house, and sells the homes.

From site to sale

The work follows a set order, and each step depends on the one before it.

  1. Finding the site. The developer buys the land, or agrees terms with an owner who wants to stay involved.
  2. Testing it. A feasibility study reads the planning rules and the ground, then sets the cost of building against what the finished homes would sell for.
  3. Design and approval. An architect draws the scheme, and the developer takes it through a development application. If the rules do not allow the project, a planning proposal comes first.
  4. Finance. Construction finance is arranged once the approval and the costs are known.
  5. Construction. A licensed builder puts up the building, and on our projects that builder is us.
  6. Sales and handover. Homes are sold off the plan, on completion or both, and the developer hands them over to their new owners.

The developer holds the risk through all of it. If building costs rise or the approval takes longer than planned, the developer’s margin absorbs the difference before anyone else feels it.

What NSW law calls a developer

For apartment buildings, NSW gives the word a wide meaning. Under the Residential Apartment Buildings (Compliance and Enforcement Powers) Act 2020, a developer includes the person who contracted, arranged or facilitated the building work. It also includes the owner of the land the building stands on, the principal contractor and the strata developer. The definition reaches past the company named on the sign, to anyone who arranged the work or owns the land.

The Act gives the developer duties near the end of the build. For a Class 2 apartment building, the developer must give the regulator notice of the expected completion date at least 6 months and no more than 12 months before applying for an occupation certificate. That notice gives Building Commission NSW time to look for serious defects before the building is finished. A developer who fails to give it faces fines, and a prohibition order can delay the occupation certificate.

Developer and builder in one company

The two roles can sit with two companies, one that owns the project and one that holds the building contract. In our case they sit with one. We procure, plan, develop and deliver our own projects, in-house and vertically integrated, and we have traded as a family business since 2001.

That shows up in the decisions. The structure, the finishes and the details are chosen by the company that will build them, so the construction cost in the feasibility study and the work on site come from the same people. At a’Maré, 2 Bando Road in Cronulla, we were the developer and the builder of three full floor residences above Elouera Beach, designed by Couvaras Architects.

Our building record goes back to the start. In 2001 we built a 13 level residential tower on Bathurst Street, and in 2002 we built 108 residential units at Bankstown. That record sits behind the construction numbers in our feasibility work.

Developers and landowners

A developer does not always buy the land outright. Some owners would rather keep a stake in what their land becomes. In a development joint venture, the landowner brings the land and the developer brings the finance and the delivery. Our planning work covers feasibility studies, planning proposals, development applications, and HDA and SSDA proposals, so an owner can start with the plain question of what the site can hold.

Questions to ask a developer

If you are buying from a developer, or thinking of offering one your land, ask plain questions and expect plain answers:

  • Who is the builder, and does the builder hold a current NSW licence?
  • What has the developer finished before, and can you go and see it?
  • Who designed the building, and who will manage the site day to day?
  • What happens after handover, and who do you call when something needs attention?

Our development work includes ongoing after-sale care, so the company that built your home is the one you call. If you own land and want to know what it could become, talk to us.